Skip to main content
Live Grid Telemetry LIVE TELEMETRY: All 4 UK Nations & 14 DNO Licence Areas Monitored
Sync: 15m
Resolved DNO Active Fault 📮 CO2
⏱️ Logged: 27 Nov 2026 at 1:02 pm GMT

UK Power Networks (Eastern - EPN) — Colchester (CO2) Power Cut

Locally Identified Impact Area: Colchester (Postcode CO2) — UKPN MULT-ccea0452-48b3-4fad-9292-114b8b61a6b5

✅ Incident Resolved — Permanent Local & Postcode Hubs

This specific fault in Colchester has concluded. Explore live regional surveillance, check nearby active postcodes, or calculate statutory compensation below.

📊 Executive Incident Telemetry

DNO Open Data / Telemetry
Operator / Service
UK Power Networks (Eastern - EPN)
East of England, Essex, Norfolk, Suffolk, Cambridgeshire
Impact / Status Scope
DNO Active Fault
Licensed Feeder & Postcode Block
✓ Total Outage Duration
1h 6m
Restored at 14:08 GMT (27 Nov)
🔒 Confirmed Restored Record
Target ETR Window
27 Nov 2026 at 4:02 pm GMT
Subject to Field Verification
Reported Cause / Type
UKPN Unplanned Power Cut
Distribution Grid Event
Regulatory Oversight
Ofgem
Ofgem SI 2015/699 (£95 / 12h)

🗳️ 1-Click Community Status Verification

Are you currently affected in Colchester (CO2)? Help neighbours and DNO loggers verify ground truth.

0 Verified Reports
🔴 Off: 0% (0) 🟡 Flickering: 0% (0) 🟢 Restored: 0% (0)

🗺️ Live Incident Epicenter & Regional Surveillance

Centered on Colchester (CO2) — Coordinates: 51.8695, 0.8953
💡 Use two fingers to pan or zoom the map. One finger scrolls the page.

Live Community Reports & Local Street Updates

Share what is happening at your UK postcode to help verify restoration progress for neighbours.

0 Verified Updates

No recent resident comments recorded for this specific location yet. Submit the first postcode update above.

Share this live UK outage status:

⚙️ Official 5-Stage Network Restoration Progression

✓ 1. Fault Logged
DNO telemetry alarm raised
✓ 2. Network Switching
Remote feeder sectionalising
✓ 3. Crew Dispatched
Field engineers en route
✓ 4. Physical Repair
Line / substation repair
⚡ 5. Re-Energised
Full supply restored

🏙️ Regional Grid Matrix: Surrounding Towns & Districts in East of England

Comparative telemetry surveillance across neighbouring administrative zones.

8 Local Districts
District / City Est. Population Grid Status Affected Premises Action
📍 Colchester (CO2)
THIS INCIDENT
126,424 Resolved DNO Active Fault Current
Luton 212,927 Stable 0 (Stable) Check →
Norwich 190,465 Stable 0 (Stable) Check →
Southend-on-Sea 182,492 Stable 0 (Stable) Check →
Peterborough 152,116 Stable 0 (Stable) Check →
Ipswich 141,228 Stable 0 (Stable) Check →
Basildon 106,795 Stable 0 (Stable) Check →
Watford 101,710 1 Active 1 Check →
Great Yarmouth 100,728 Stable 0 (Stable) Check →

🧭 Permanent Utility & Postcode Outage Hubs

Monitor ongoing utility infrastructure health, historical reliability and nearby sector telemetry across Colchester (CO2).

Verification & Oversight Facts — Incident #27002

Power Cut
Telemetry Source Official UK Operator Open Data / Feed
Monitored Provider UK Power Networks (Eastern - EPN) (9,054 incident(s) in past 30 days)
UK Region & District Colchester (CO2) — East of England (8,401 regional power cut event(s) in 30 days)
Statutory Regulator Ofgem — Ofgem SI 2015/699 (£95 / 12h)
Official Helpline / Map 105 • Postcode Hub: CO2

Recent UK Power Networks Incidents

All UK Power Networks Logs →
Location / Area Status Impact Logged
Stapleford Abbotts (RM4)
Stapleford Abbotts (Postcode RM4) — UKPN MULT-cb7a8772-c7c2-4f28-82…
Active DNO Active Fault 9 mins ago
Barking (RM8)
Barking (Postcode RM8) — UKPN MULT-27918e3e-02ca-411c-8081-c260cad7…
Active DNO Active Fault 9 mins ago
Stapleford Abbotts (RM4)
Stapleford Abbotts (Postcode RM4) — UKPN MULT-a35c599b-8302-4af4-9a…
Resolved DNO Active Fault 24 mins ago
Barking (RM8)
Barking (Postcode RM8) — UKPN MULT-7b475fda-405b-4a4f-a626-24202d17…
Resolved DNO Active Fault 24 mins ago
Barking (RM8)
Barking (Postcode RM8) — UKPN MULT-3fb95933-6414-4e26-b8c5-374ea84c…
Resolved DNO Active Fault 39 mins ago
Barking (RM8)
Barking (Postcode RM8) — UKPN MULT-06b02b67-5287-4ef7-acf0-674ab9fd…
Resolved DNO Active Fault 42 mins ago

Incident #27002 Questions & Consumer Guidance

What is the current status of UK Power Networks (Eastern - EPN) incident #27002 in Colchester (CO2)?
Incident #27002 (Power Cut) in Colchester (CO2) is logged as Resolved via Official UK Operator Open Data / Feed (DNO Active Fault). Over the past 30 days, 9054 incident(s) have been logged for UK Power Networks (Eastern - EPN).
When is UK Power Networks (Eastern - EPN) expected to restore service in Colchester (CO2)?
This incident was marked restored at 27 Nov 2026 at 2:08 pm GMT after a logged duration of 1h 6m.
Are households in Colchester (CO2) eligible for Ofgem £95 compensation on incident #27002?
Under Ofgem Guaranteed Standards (SI 2015/699), unplanned normal-weather electricity cuts exceeding 12 continuous hours qualify for £95 plus £40 per additional 12-hour period (capped at £360). This incident has currently logged 1h 6m.
Related UK Consumer Guide
UK Power Cuts: How to Call 105, Verify Your DNO & Claim £95 Ofgem Compensation
Read Guide →