Skip to main content
Live Grid Telemetry LIVE TELEMETRY: All 4 UK Nations & 14 DNO Licence Areas Monitored
Sync: 15m
Active 1 properties 📮 GL2
⏱️ Logged: 18 Nov 2026 at 4:47 pm GMT

National Grid ED (West Midlands) — Gloucester (GL2) Power Cut

Locally Identified Impact Area: Gloucester (Postcode GL2) — NGED INCD-80772-m

📊 Executive Incident Telemetry

SCADA Live Feed Active
⏱️ Target Re-Energisation (ETR)
19 Nov 2026 at 2:47 am GMT
Calculating...
Licensed Operator
National Grid ED (West Midlands)
West Midlands, East Midlands, South Wales, South West
Customers Off-Supply
1 properties
Underlying Feeder Block
Elapsed Blackout Time
7h 2m
Since 16:47 GMT
Target ETR Window
19 Nov 2026 at 2:47 am GMT
Subject to Safety Isolation
Engineering Classification
National Grid ED (LV OVERHEAD) — In progress
Primary Feeder Event
Statutory Jurisdiction
Ofgem
SI 2015/699 Standards

🗳️ 1-Click Community Status Verification

Are you currently affected in Gloucester (GL2)? Help neighbours and DNO loggers verify ground truth.

0 Verified Reports
🔴 Off: 0% (0) 🟡 Flickering: 0% (0) 🟢 Restored: 0% (0)

🗺️ Live Incident Epicenter & Regional Surveillance

Centered on Gloucester (GL2) — Coordinates: 51.8464, -2.2671
💡 Use two fingers to pan or zoom the map. One finger scrolls the page.

Live Community Reports & Local Street Updates

Share what is happening at your UK postcode to help verify restoration progress for neighbours.

1 Verified Updates
Colin T. BS30 • Warmley Service Down

Power has gone down for the 2nd evening running. 8.50 pm.
Will no doubt be restored just before the 12 hours when compensation would be due ( funny that).
A planned power cut is due Friday 20th as well.

Share this live UK outage status:

⚙️ Official 5-Stage Network Restoration Progression

✓ 1. SCADA Trip
Feeder alarm logged
✓ 2. FDIR Switching
Remote sectionalising
✓ 3. Crew Dispatched
Engineers en route
⚡ 4. Physical Repair
Jointing & excavation
5. Re-Energised
Full supply restored

🏙️ Regional Grid Matrix: Surrounding Towns & Districts in South West England

Comparative telemetry surveillance across neighbouring administrative zones.

8 Local Districts
District / City Est. Population Grid Status Affected Premises Action
📍 Gloucester (GL2)
THIS INCIDENT
133,774 Active Outage 1 properties Current
Bristol 411,361 1 Active 25 Check →
Plymouth 265,202 Stable 0 (Stable) Check →
Swindon 240,758 6 Active 0 (Stable) Check →
Bournemouth 187,736 Stable 0 (Stable) Check →
Kingswood 138,378 3 Active 243 Check →
Poole 134,588 1 Active 0 (Stable) Check →
Torbay 133,720 Stable 0 (Stable) Check →
Exeter 121,823 Stable 0 (Stable) Check →

High-Voltage Distribution Feeder & Substation Switchgear Diagnostics

Focus: HV Circuit Breaker & Substation Feeder Isolation
Overhead Line Crew Jointing inspecting utility infrastructure in Gloucester (GL2)
Active technical deployment deployed for Gloucester (GL2): High-voltage technicians repairing pole-mounted transformer conductor line. Overhead Line Crew Jointing

Distribution network telemetry recorded an automatic trip sequence on the regional 33kV/11kV secondary substation serving Gloucester (GL2). Under standard UK network topology, primary substations step down supply from Grid Supply Points (GSPs) to 11,000 volts for urban and suburban ring mains. When unexpected phase-to-earth fault currents or impedance anomalies occur—frequently triggered by underground cable breakdown or component insulation degradation—vacuum circuit breakers (VCBs) or SF6 gas-insulated switchgear trip instantaneously within 80 milliseconds to isolate the faulted section and prevent catastrophic cascade damage to upstream distribution transformers.

National Grid ED (West Midlands)'s network control center utilizes Fault Defection, Isolation, and Restoration (FDIR) SCADA automation to remotely sectionalise the 11kV network. By opening automated mid-line sectionalisers and closing normally-open tie switches on adjacent healthy feeders, operators attempt back-feeding unaffected circuits. For customers in Gloucester (GL2) remaining off-supply, manual field switching by authorised Senior Authorised Persons (SAPs) is mandatory to establish mechanical safety isolation, test earthing rods, and conduct insulation resistance tests before line re-energisation.

Network operations in South West England adhere strictly to Energy Networks Association (ENA) Technical Specifications and BS 7671 standards. Households experiencing power restoration may witness brief secondary voltage fluctuations as local distribution transformers adjust automatic tap changers (OLTC) under variable inductive motor inrush loads across the local low-voltage (400V/230V) network.

🛡️ Citizen Action & Electrical Safety Protocol

Essential safety procedures and statutory consumer protections for Gloucester (GL2).

⚡ Step 1: Fusebox Check

Consumer Unit & RCD Trip Verification

Check whether your main Consumer Unit (fusebox) has tripped. If the Residual Current Device (RCD) or an individual Miniature Circuit Breaker (MCB) is down, toggle it up. If street lighting and neighbouring homes are also unlit, the issue is on National Grid ED (West Midlands)'s external 11kV/LV distribution grid, not your home wiring.

📞 Emergency Dispatch

Call 105 Free National Power Cut Line

Dial 105 free from any UK landline or mobile phone to connect directly to National Grid ED (West Midlands)'s emergency control room. Report hazardous damaged lines, fallen wooden poles, or substation smoke. The line operates 24/7/365 across England, Scotland, and Wales.

🧊 Food Safety

Food Standards Agency (FSA) 4-Hour Rule

Keep refrigerator and freezer doors firmly closed. A standard unopened domestic fridge safely maintains food temperatures for 4 hours. A full unopened freezer will keep contents safe for up to 48 hours (24 hours if half full). Discard perishable dairy and poultry if fridge temperature exceeds 8°C for over 2 hours.

🛡️ Equipment Safety

Appliance Surge Isolation Protocol

Switch off sensitive electronic devices—including OLED televisions, desktop computers, heat pumps, and induction hobs—at the wall socket. When National Grid ED (West Midlands) re-energizes the local circuit, momentary inductive inrush voltage spikes can damage sensitive microprocessors.

💷 Legal Rights

Ofgem £95 Compensation Eligibility

Under Ofgem Guaranteed Standards, if your electricity supply is interrupted for 12 continuous hours under normal weather conditions, you are legally owed £95 by National Grid ED (West Midlands), plus £40 per additional 12-hour block (up to £360). In most cases, DNOs must credit your supplier within 10 working days.

🚨 Vulnerable Households

Priority Services Register (PSR) Support

If anyone in your household is of pensionable age, has a disability, is reliant on vital medical equipment (oxygen concentrators, kidney dialysis), or has an infant under 5, contact National Grid ED (West Midlands) to request emergency backup power, warm facilities, or mobile welfare vans under PSR guidelines.

📶 Communications

Emergency 999 National Roaming & Wi-Fi Calling

If your primary mobile carrier (EE, O2, Vodafone, or Three) loses cellular coverage, emergency 999 calls will automatically national-roam onto whichever carrier mast has operational battery backup in your area. For standard calls, connect your handset to battery-backed Wi-Fi.

🔥 Life Safety

Gas Smell Safety: 0800 111 999

If you smell natural gas during a blackout, do NOT touch any light switches, do NOT light candles, and do NOT use doorbells. Extinguish open flames, open windows to ventilate, evacuate all occupants, and immediately call the National Gas Emergency Service free on 0800 111 999.