Complete power cut
⏱️ Logged: 28 Nov 2026 at 12:46 am GMT
SSEN (Southern Electric - SEPD) — Hillingdon (UB7) Power Cut
Locally Identified Impact Area: Hillingdon (Postcode UB7) — SSEN UM4110
📊 Executive Incident Telemetry
DNO Open Data / Telemetry
⏱️ Target Re-Energisation (ETR)
28 Nov 2026 at 4:32 am GMT
Calculating...
Operator / Service
SSEN (Southern Electric - SEPD)
Oxfordshire, Berkshire, Hampshire, Dorset, Wiltshire, West London
Impact / Status Scope
DNO Active Fault
Licensed Feeder & Postcode Block
Elapsed Outage Time
LIVE
57 mins
Since 00:46 GMT
⚖️
Ofgem £95 trigger in 12h
Target ETR Window
28 Nov 2026 at 4:32 am GMT
Subject to Field Verification
Reported Cause / Type
SSEN Unplanned Fault (LV) — awaiting
Distribution Grid Event
Regulatory Oversight
Ofgem
Ofgem SI 2015/699 (£95 / 12h)
🗳️ 1-Click Community Status Verification
Are you currently affected in Hillingdon (UB7)? Help neighbours and DNO loggers verify ground truth.
🔴 Off: 0% (0)
🟡 Flickering: 0% (0)
🟢 Restored: 0% (0)
🗺️ Live Incident Epicenter & Regional Surveillance
Centered on Hillingdon (UB7) — Coordinates: 51.5058, -0.4696
💡 Use two fingers to pan or zoom the map. One finger scrolls the page.
Live Community Reports & Local Street Updates
Share what is happening at your UK postcode to help verify restoration progress for neighbours.
Marc D
SN11
• Heron Close
Service Down
Share this live UK outage status:
⚙️ Official 5-Stage Network Restoration Progression
✓ 1. Fault Logged
DNO telemetry alarm raised
⚡ 2. Network Switching
Remote feeder sectionalising
3. Crew Dispatched
Field engineers en route
4. Physical Repair
Line / substation repair
5. Re-Energised
Full supply restored
🏙️ Regional Grid Matrix: Surrounding Towns & Districts in London
Comparative telemetry surveillance across neighbouring administrative zones.
| District / City | Est. Population | Grid Status | Affected Premises | Action |
|---|---|---|---|---|
|
📍 Hillingdon (UB7)
THIS INCIDENT
|
259,620 | Active | DNO Active Fault | Current |
| Croydon | 370,432 | Stable | 0 (Stable) | Check → |
| Enfield | 331,058 | Stable | 0 (Stable) | Check → |
| Camberwell | 320,289 | Stable | 0 (Stable) | Check → |
| Barnet | 318,747 | Stable | 0 (Stable) | Check → |
| Brent | 316,883 | Stable | 0 (Stable) | Check → |
| Lambeth | 300,113 | Stable | 0 (Stable) | Check → |
| Bromley | 299,925 | Stable | 0 (Stable) | Check → |
| Wandsworth | 287,060 | Stable | 0 (Stable) | Check → |
🧭 Permanent Utility & Postcode Outage Hubs
Monitor ongoing utility infrastructure health, historical reliability and nearby sector telemetry across Hillingdon (UB7).
Verification & Oversight Facts — Incident #27577
Power Cut| Telemetry Source | Official UK Operator Open Data / Feed |
|---|---|
| Monitored Provider | SSEN (Southern Electric - SEPD) (881 incident(s) in past 30 days) |
| UK Region & District | Hillingdon (UB7) — London (4,956 regional power cut event(s) in 30 days) |
| Statutory Regulator | Ofgem — Ofgem SI 2015/699 (£95 / 12h) |
| Official Helpline / Map | 105 • Postcode Hub: UB7 |
Recent SSEN Incidents
All SSEN Logs →| Location / Area | Status | Impact | Logged |
|---|---|---|---|
|
Thatcham (RG19)
Thatcham (Postcode RG19) — SSEN UM4114
|
Active | DNO Active Fault | 9 hours ago |
|
High Wycombe (HP12)
High Wycombe (Postcode HP12) — SSEN UM4083
|
Active | DNO Active Fault | 2 hours ago |
|
Bracknell (RG12)
Bracknell (Postcode RG12) — SSEN UM4069
|
Active | DNO Active Fault | 3 hours ago |
|
Farnborough (GU14)
Farnborough (Postcode GU14) — SSEN UM4075
|
Active | DNO Active Fault | 3 hours ago |
|
Oxford (OX3)
Oxford (Postcode OX3) — SSEN UM3788
|
Active | DNO Active Fault | 8 hours ago |
|
Southall (UB2)
Southall (Postcode UB2) — SSEN UM4089
|
Resolved | DNO Active Fault | 2 hours ago |
Other Power Cut Logs in London
London Hub →| Provider | Area | Status | Logged |
|---|---|---|---|
| Octopus Energy | Richmond (TW9) | Investigating | 3 hours ago |
| UK Power Networks (London - LPN) | Tottenham (N22) | Resolved | 1 hours ago |
| SSEN (Southern Electric - SEPD) | Southall (UB2) | Resolved | 2 hours ago |
| UK Power Networks (London - LPN) | Tottenham (N10) | Resolved | 1 hours ago |
| UK Power Networks (London - LPN) | Islington (N5) | Resolved | 3 hours ago |
| UK Power Networks (London - LPN) | Tottenham (N10) | Resolved | 1 hours ago |
Incident #27577 Questions & Consumer Guidance
What is the current status of SSEN (Southern Electric - SEPD) incident #27577 in Hillingdon (UB7)?
Incident #27577 (Power Cut) in Hillingdon (UB7) is logged as Active via Official UK Operator Open Data / Feed (DNO Active Fault). Over the past 30 days, 881 incident(s) have been logged for SSEN (Southern Electric - SEPD).
When is SSEN (Southern Electric - SEPD) expected to restore service in Hillingdon (UB7)?
Current telemetry targets restoration around 28 Nov 2026 at 4:32 am GMT, subject to field engineering progress.
Are households in Hillingdon (UB7) eligible for Ofgem £95 compensation on incident #27577?
Under Ofgem Guaranteed Standards (SI 2015/699), unplanned normal-weather electricity cuts exceeding 12 continuous hours qualify for £95 plus £40 per additional 12-hour period (capped at £360). This incident has currently logged 57 mins.
Related UK Consumer Guide
UK Power Cuts: How to Call 105, Verify Your DNO & Claim £95 Ofgem Compensation