Ofgem Guaranteed Standards of Performance (SI 2015/699) & Statutory Rights
Focus: Statutory Compensation (£95 Baseline) & PSR EntitlementsElectricity distribution across Great Britain is strictly governed by the Office of Gas and Electricity Markets (Ofgem) under The Electricity (Standards of Performance) Regulations 2015 (Statutory Instrument 2015/699). Under Standard Guaranteed Performance Standard 2 (Supply Restoration: Normal Conditions), if an unplanned electricity cut occurs and supply is not safely restored within 12 continuous hours, domestic customers in Croydon (CR0) are legally entitled to a fixed statutory compensation payment of £95.
For extended outages exceeding the initial 12-hour threshold, the regulations mandate that Thames Water must automatically issue an additional £40 payment for every continuous 12-hour period that the property remains disconnected, up to a statutory cap of £360. In designated severe weather incidents (Categories 1 and 2 storms as classified by Met Office wind-speed thresholds), the baseline restoration window expands to 24 or 48 hours, with £85 paid initially and £40 per subsequent 6-hour delay up to an enhanced statutory maximum of £2,000.
Under Standard Licence Condition 10, licensed distribution operators are required to maintain a comprehensive Priority Services Register (PSR). Vulnerable residents in Croydon (CR0)—including pensioners, households reliant on medical life-support equipment (such as home kidney dialysis, oxygen concentrators, or powered wheelchairs), and families with infants under 5—are entitled to priority emergency assistance, emergency hot meal provision, and free mobile power generation support during prolonged supply failures.