Skip to main content
Live Grid Telemetry LIVE TELEMETRY: All 4 UK Nations & 14 DNO Licence Areas Monitored
Sync: 15m
Scheduled 17 properties 📮 HA7
⏱️ Logged: 28 Nov 2026 at 1:42 am GMT

UK Power Networks (London - LPN) — Harrow (HA7) Power Cut

Locally Identified Impact Area: Harrow (Postcode HA7) — UKPN INCD-650282-Z

📊 Executive Incident Telemetry

DNO Open Data / Telemetry
⏱️ Target Re-Energisation (ETR)
28 Nov 2026 at 9:47 am GMT
Calculating...
Operator / Service
UK Power Networks (London - LPN)
Greater London
Impact / Status Scope
17 properties
Licensed Feeder & Postcode Block
Elapsed Outage Time LIVE
2h 17m
Since 01:42 GMT
⚖️ Ofgem £95 trigger in 10h
Target ETR Window
28 Nov 2026 at 9:47 am GMT
Subject to Field Verification
Reported Cause / Type
A fault has occurred on an underground electricity cable affecting the local area, we may have to dig up the road to carry out repairs.
Distribution Grid Event
Regulatory Oversight
Ofgem
Ofgem SI 2015/699 (£95 / 12h)

🗳️ 1-Click Community Status Verification

Are you currently affected in Harrow (HA7)? Help neighbours and DNO loggers verify ground truth.

0 Verified Reports
🔴 Off: 0% (0) 🟡 Flickering: 0% (0) 🟢 Restored: 0% (0)

🗺️ Live Incident Epicenter & Regional Surveillance

Centered on Harrow (HA7) — Coordinates: 51.6097, -0.3073
💡 Use two fingers to pan or zoom the map. One finger scrolls the page.

Live Community Reports & Local Street Updates

Share what is happening at your UK postcode to help verify restoration progress for neighbours.

1 Verified Updates
B SE13 • Exchange point, loampit vale Service Down

No power

Share this live UK outage status:

⚙️ Official 5-Stage Network Restoration Progression

⚡ 1. Fault Logged
DNO telemetry alarm raised
2. Network Switching
Remote feeder sectionalising
3. Crew Dispatched
Field engineers en route
4. Physical Repair
Line / substation repair
5. Re-Energised
Full supply restored

🏙️ Regional Grid Matrix: Surrounding Towns & Districts in London

Comparative telemetry surveillance across neighbouring administrative zones.

8 Local Districts
District / City Est. Population Grid Status Affected Premises Action
📍 Harrow (HA7)
THIS INCIDENT
245,646 Scheduled 17 properties Current
Croydon 370,432 Stable 0 (Stable) Check →
Enfield 331,058 Stable 0 (Stable) Check →
Camberwell 320,289 Stable 0 (Stable) Check →
Barnet 318,747 Stable 0 (Stable) Check →
Brent 316,883 Stable 0 (Stable) Check →
Lambeth 300,113 Stable 0 (Stable) Check →
Bromley 299,925 Stable 0 (Stable) Check →
Wandsworth 287,060 Stable 0 (Stable) Check →

🧭 Permanent Utility & Postcode Outage Hubs

Monitor ongoing utility infrastructure health, historical reliability and nearby sector telemetry across Harrow (HA7).

Verification & Oversight Facts — Incident #27619

Power Cut
Telemetry Source Official UK Operator Open Data / Feed
Monitored Provider UK Power Networks (London - LPN) (3,165 incident(s) in past 30 days)
UK Region & District Harrow (HA7) — London (4,959 regional power cut event(s) in 30 days)
Statutory Regulator Ofgem — Ofgem SI 2015/699 (£95 / 12h)
Official Helpline / Map 105 • Postcode Hub: HA7

Recent UK Power Networks Incidents

All UK Power Networks Logs →
Location / Area Status Impact Logged
Hackney (E5)
Hackney (Postcode E5) — UKPN INCD-83972-N
Resolved 9 properties 2 hours ago
Harrow (HA7)
Harrow (Postcode HA7) — UKPN MULT-e0053a80-13dc-490b-8fec-86e226a64…
Resolved DNO Active Fault 43 mins ago
Tottenham (N22)
Tottenham (Postcode N22) — UKPN INCD-650279-Z
Resolved 356 properties 3 hours ago
Tottenham (N10)
Tottenham (Postcode N10) — UKPN MULT-a90e7224-37ed-46b0-a7ca-3afc74…
Resolved DNO Active Fault 3 hours ago
Islington (N5)
Islington (Postcode N5) — UKPN INCD-83969-N
Resolved 94 properties 5 hours ago
Tottenham (N10)
Tottenham (Postcode N10) — UKPN MULT-a662f9a2-cec8-4d72-847d-83849b…
Resolved DNO Active Fault 4 hours ago

Other Power Cut Logs in London

London Hub →

Incident #27619 Questions & Consumer Guidance

What is the current status of UK Power Networks (London - LPN) incident #27619 in Harrow (HA7)?
Incident #27619 (Power Cut) in Harrow (HA7) is logged as Scheduled via Official UK Operator Open Data / Feed (17 properties). Over the past 30 days, 3165 incident(s) have been logged for UK Power Networks (London - LPN).
When is UK Power Networks (London - LPN) expected to restore service in Harrow (HA7)?
Current telemetry targets restoration around 28 Nov 2026 at 9:47 am GMT, subject to field engineering progress.
Are households in Harrow (HA7) eligible for Ofgem £95 compensation on incident #27619?
Under Ofgem Guaranteed Standards (SI 2015/699), unplanned normal-weather electricity cuts exceeding 12 continuous hours qualify for £95 plus £40 per additional 12-hour period (capped at £360). This incident has currently logged 2h 17m.
Related UK Consumer Guide
UK Power Cuts: How to Call 105, Verify Your DNO & Claim £95 Ofgem Compensation
Read Guide →