Skip to main content
Live Grid Telemetry LIVE TELEMETRY: All 4 UK Nations & 14 DNO Licence Areas Monitored
Sync: 15m
Active DNO Active Fault 📮 BN6
⏱️ Logged: 27 Nov 2026 at 6:47 pm GMT

UK Power Networks (South Eastern - SPN) — Clayton (BN6) Power Cut

Locally Identified Impact Area: Clayton (Postcode BN6) — UKPN MULT-1489b596-a8d2-49fd-b917-158dfc25350e

📊 Executive Incident Telemetry

DNO Open Data / Telemetry
⏱️ Target Re-Energisation (ETR)
27 Nov 2026 at 9:47 pm GMT
Calculating...
Operator / Service
UK Power Networks (South Eastern - SPN)
Kent, Sussex & Surrey
Impact / Status Scope
DNO Active Fault
Licensed Feeder & Postcode Block
Elapsed Outage Time LIVE
3 mins
Since 18:47 GMT
⚖️ Ofgem £95 trigger in 12h
Target ETR Window
27 Nov 2026 at 9:47 pm GMT
Subject to Field Verification
Reported Cause / Type
UKPN Unplanned Power Cut
Distribution Grid Event
Regulatory Oversight
Ofgem
Ofgem SI 2015/699 (£95 / 12h)

🗳️ 1-Click Community Status Verification

Are you currently affected in Clayton (BN6)? Help neighbours and DNO loggers verify ground truth.

0 Verified Reports
🔴 Off: 0% (0) 🟡 Flickering: 0% (0) 🟢 Restored: 0% (0)

🗺️ Live Incident Epicenter & Regional Surveillance

Centered on Clayton (BN6) — Coordinates: 50.9292, -0.1528
💡 Use two fingers to pan or zoom the map. One finger scrolls the page.

Live Community Reports & Local Street Updates

Share what is happening at your UK postcode to help verify restoration progress for neighbours.

0 Verified Updates

No recent resident comments recorded for this specific location yet. Submit the first postcode update above.

Share this live UK outage status:

⚙️ Official 5-Stage Network Restoration Progression

✓ 1. Fault Logged
DNO telemetry alarm raised
⚡ 2. Network Switching
Remote feeder sectionalising
3. Crew Dispatched
Field engineers en route
4. Physical Repair
Line / substation repair
5. Re-Energised
Full supply restored

🏙️ Regional Grid Matrix: Surrounding Towns & Districts in South East England

Comparative telemetry surveillance across neighbouring administrative zones.

8 Local Districts
District / City Est. Population Grid Status Affected Premises Action
📍 Clayton (BN6)
THIS INCIDENT
17,588 Active DNO Active Fault Current
Brighton 277,763 Stable 0 (Stable) Check →
Milton Keynes 256,790 Stable 0 (Stable) Check →
Southampton 247,845 Stable 0 (Stable) Check →
Portsmouth 204,818 Stable 0 (Stable) Check →
Reading 191,839 Stable 0 (Stable) Check →
Oxford 170,837 1 Active 0 (Stable) Check →
Colnbrook with Poyle 168,774 Stable 0 (Stable) Check →
Canterbury 132,916 Stable 0 (Stable) Check →

🧭 Permanent Utility & Postcode Outage Hubs

Monitor ongoing utility infrastructure health, historical reliability and nearby sector telemetry across Clayton (BN6).

Verification & Oversight Facts — Incident #27282

Power Cut
Telemetry Source Official UK Operator Open Data / Feed
Monitored Provider UK Power Networks (South Eastern - SPN) (5,571 incident(s) in past 30 days)
UK Region & District Clayton (BN6) — South East England (5,930 regional power cut event(s) in 30 days)
Statutory Regulator Ofgem — Ofgem SI 2015/699 (£95 / 12h)
Official Helpline / Map 105 • Postcode Hub: BN6

Recent UK Power Networks Incidents

All UK Power Networks Logs →
Location / Area Status Impact Logged
Royal Tunbridge Wells (TN2)
Royal Tunbridge Wells (Postcode TN2) — UKPN MULT-4ed92fc1-33c3-4f15…
Active DNO Active Fault 3 mins ago
Clayton (BN6)
Clayton (Postcode BN6) — UKPN MULT-f72ff405-5f21-4e7e-9004-9a22c5a5…
Resolved DNO Active Fault 18 mins ago
Royal Tunbridge Wells (TN2)
Royal Tunbridge Wells (Postcode TN2) — UKPN MULT-ad8d47c7-25eb-45a3…
Resolved DNO Active Fault 18 mins ago
Royal Tunbridge Wells (TN2)
Royal Tunbridge Wells (Postcode TN2) — UKPN MULT-6e271f97-175f-495f…
Resolved DNO Active Fault 33 mins ago
Clayton (BN6)
Clayton (Postcode BN6) — UKPN MULT-ab65bf6f-36d7-4601-bcdd-d24eac05…
Resolved DNO Active Fault 33 mins ago
Royal Tunbridge Wells (TN2)
Royal Tunbridge Wells (Postcode TN2) — UKPN MULT-d12e64c2-f49b-4e87…
Resolved DNO Active Fault 48 mins ago

Incident #27282 Questions & Consumer Guidance

What is the current status of UK Power Networks (South Eastern - SPN) incident #27282 in Clayton (BN6)?
Incident #27282 (Power Cut) in Clayton (BN6) is logged as Active via Official UK Operator Open Data / Feed (DNO Active Fault). Over the past 30 days, 5571 incident(s) have been logged for UK Power Networks (South Eastern - SPN).
When is UK Power Networks (South Eastern - SPN) expected to restore service in Clayton (BN6)?
Current telemetry targets restoration around 27 Nov 2026 at 9:47 pm GMT, subject to field engineering progress.
Are households in Clayton (BN6) eligible for Ofgem £95 compensation on incident #27282?
Under Ofgem Guaranteed Standards (SI 2015/699), unplanned normal-weather electricity cuts exceeding 12 continuous hours qualify for £95 plus £40 per additional 12-hour period (capped at £360). This incident has currently logged 3 mins.
Related UK Consumer Guide
UK Power Cuts: How to Call 105, Verify Your DNO & Claim £95 Ofgem Compensation
Read Guide →