Complete power cut
⏱️ Logged: 29 Nov 2026 at 8:30 am GMT
SSEN (Southern Electric - SEPD) — Mudford (BA22) Power Cut
Locally Identified Impact Area: Mudford (Postcode BA22) — SSEN 256689
📊 Executive Incident Telemetry
DNO Open Data / Telemetry
⏱️ Target Re-Energisation (ETR)
29 Nov 2026 at 4:00 pm GMT
Calculating...
Operator / Service
SSEN (Southern Electric - SEPD)
Oxfordshire, Berkshire, Hampshire, Dorset, Wiltshire, West London
Impact / Status Scope
DNO Active Fault
Licensed Feeder & Postcode Block
Elapsed Outage Time
LIVE
1h 22m
Since 08:30 GMT
⚖️
Ofgem £95 trigger in 11h
Target ETR Window
29 Nov 2026 at 4:00 pm GMT
Subject to Field Verification
Reported Cause / Type
SSEN Planned Network Work
Distribution Grid Event
Regulatory Oversight
Ofgem
Ofgem SI 2015/699 (£95 / 12h)
🗳️ 1-Click Community Status Verification
Are you currently affected in Mudford (BA22)? Help neighbours and DNO loggers verify ground truth.
🔴 Off: 0% (0)
🟡 Flickering: 0% (0)
🟢 Restored: 0% (0)
🗺️ Live Incident Epicenter & Regional Surveillance
Centered on Mudford (BA22) — Coordinates: 50.9681, -2.6367
💡 Use two fingers to pan or zoom the map. One finger scrolls the page.
Live Community Reports & Local Street Updates
Share what is happening at your UK postcode to help verify restoration progress for neighbours.
Marc D
SN11
• Heron Close
Service Down
Share this live UK outage status:
⚙️ Official 5-Stage Network Restoration Progression
⚡ 1. Fault Logged
DNO telemetry alarm raised
2. Network Switching
Remote feeder sectionalising
3. Crew Dispatched
Field engineers en route
4. Physical Repair
Line / substation repair
5. Re-Energised
Full supply restored
🏙️ Regional Grid Matrix: Surrounding Towns & Districts in South West England
Comparative telemetry surveillance across neighbouring administrative zones.
| District / City | Est. Population | Grid Status | Affected Premises | Action |
|---|---|---|---|---|
|
📍 Mudford (BA22)
THIS INCIDENT
|
18,102 | Scheduled | DNO Active Fault | Current |
| Bristol | 411,361 | Stable | 0 (Stable) | Check → |
| Plymouth | 265,202 | 1 Active | 53 | Check → |
| Swindon | 240,758 | 1 Active | 0 (Stable) | Check → |
| Bournemouth | 187,736 | Stable | 0 (Stable) | Check → |
| Kingswood | 138,378 | Stable | 0 (Stable) | Check → |
| Poole | 134,588 | 1 Active | 0 (Stable) | Check → |
| Gloucester | 133,774 | 1 Active | 6 | Check → |
| Torbay | 133,720 | Stable | 0 (Stable) | Check → |
🧭 Permanent Utility & Postcode Outage Hubs
Monitor ongoing utility infrastructure health, historical reliability and nearby sector telemetry across Mudford (BA22).
Verification & Oversight Facts — Incident #29292
Power Cut| Telemetry Source | Official UK Operator Open Data / Feed |
|---|---|
| Monitored Provider | SSEN (Southern Electric - SEPD) (980 incident(s) in past 30 days) |
| UK Region & District | Mudford (BA22) — South West England (879 regional power cut event(s) in 30 days) |
| Statutory Regulator | Ofgem — Ofgem SI 2015/699 (£95 / 12h) |
| Official Helpline / Map | 105 • Postcode Hub: BA22 |
Recent SSEN Incidents
All SSEN Logs →| Location / Area | Status | Impact | Logged |
|---|---|---|---|
|
Farnham (GU10)
Farnham (Postcode GU10) — SSEN UM5825
|
Active | DNO Active Fault | 2 hours ago |
|
Andover (SP10)
Andover (Postcode SP10) — SSEN UM5880
|
Active | DNO Active Fault | 1 hours ago |
|
Southwick (PO7)
Southwick (Postcode PO7) — SSEN UM5823
|
Active | DNO Active Fault | 2 hours ago |
|
Wallingford (OX10)
Wallingford (Postcode OX10) — SSEN UM5832
|
Active | DNO Active Fault | 2 hours ago |
|
Thatcham (RG19)
Thatcham (Postcode RG19) — SSEN UM5854
|
Active | DNO Active Fault | 2 hours ago |
|
Trowbridge (BA14)
Trowbridge (Postcode BA14) — SSEN UM5639
|
Active | DNO Active Fault | 8 hours ago |
Other Power Cut Logs in South West England
South West England Hub →| Provider | Area | Status | Logged |
|---|---|---|---|
| National Grid ED (West Midlands) | Gloucester (GL4) | Active | 2 hours ago |
| National Grid ED (South West) | Ottery St Mary (EX11) | Active | 1 hours ago |
| National Grid ED (South West) | Plymouth (PL5) | Active | 2 hours ago |
| National Grid ED (South West) | Allington (DT6) | Active | 2 hours ago |
| SSEN (Southern Electric - SEPD) | Trowbridge (BA14) | Active | 8 hours ago |
| SSEN (Southern Electric - SEPD) | Weymouth (DT3) | Active | 4 hours ago |
Incident #29292 Questions & Consumer Guidance
What is the current status of SSEN (Southern Electric - SEPD) incident #29292 in Mudford (BA22)?
Incident #29292 (Power Cut) in Mudford (BA22) is logged as Scheduled via Official UK Operator Open Data / Feed (DNO Active Fault). Over the past 30 days, 980 incident(s) have been logged for SSEN (Southern Electric - SEPD).
When is SSEN (Southern Electric - SEPD) expected to restore service in Mudford (BA22)?
Current telemetry targets restoration around 29 Nov 2026 at 4:00 pm GMT, subject to field engineering progress.
Are households in Mudford (BA22) eligible for Ofgem £95 compensation on incident #29292?
Under Ofgem Guaranteed Standards (SI 2015/699), unplanned normal-weather electricity cuts exceeding 12 continuous hours qualify for £95 plus £40 per additional 12-hour period (capped at £360). This incident has currently logged 1h 22m.
Related UK Consumer Guide
UK Power Cuts: How to Call 105, Verify Your DNO & Claim £95 Ofgem Compensation