Skip to main content
LIVE TELEMETRY: All 4 UK Nations & 14 DNO Licence Areas Monitored
Sync: 15m
Active 17 properties 📮 District: ST1 Logged: 18 Nov 2026 at 2:00 pm GMT

National Grid ED (West Midlands) — Stoke-on-Trent (ST1) Power Cut

Locally Identified Impact Area: Stoke-on-Trent (Postcode ST1) — NGED INCD-80748-m

📞 Call 105 Free National Grid ED (West Midlands) Hub ⚠️ Report Fault
Share this live UK outage status:

📊 Executive Incident Telemetry

SCADA Live Feed Active
⏱️ Target Re-Energisation (ETR)
18 Nov 2026 at 5:47 pm GMT
Calculating...
Licensed Operator
National Grid ED (West Midlands)
West Midlands, East Midlands, South Wales, South West
Customers Off-Supply
17 properties
Underlying Feeder Block
Elapsed Blackout Time
0h 54m
Since 14:00 GMT
Target ETR Window
18 Nov 2026 at 5:47 pm GMT
Subject to Safety Isolation
Engineering Classification
National Grid ED (LV FUSE) — Awaiting
Primary Feeder Event
Statutory Jurisdiction
Ofgem
SI 2015/699 Standards

🗳️ 1-Click Community Status Verification

Are you currently affected in Stoke-on-Trent (ST1)? Help neighbours and DNO loggers verify ground truth.

0 Verified Reports
🔴 Off: 0% (0) 🟡 Flickering: 0% (0) 🟢 Restored: 0% (0)

🗺️ Live Incident Epicenter & Regional Surveillance

Centered on Stoke-on-Trent (ST1) — Coordinates: 53.0262, -2.1715
💡 Use two fingers to pan or zoom the map. One finger scrolls the page.

Live Community Reports & Local Street Updates

Share what is happening at your UK postcode to help verify restoration progress for neighbours.

0 Verified Updates

No recent resident comments recorded for this specific location yet. Submit the first postcode update above.

⚙️ Official 5-Stage Network Restoration Progression

✓ 1. SCADA Trip
Feeder alarm logged
⚡ 2. FDIR Switching
Remote sectionalising
3. Crew Dispatched
Engineers en route
4. Physical Repair
Jointing & excavation
5. Re-Energised
Full supply restored

🏙️ Regional Grid Matrix: Surrounding Towns & Districts in West Midlands

Comparative telemetry surveillance across neighbouring administrative zones.

8 Local Districts
District / City Est. Population Grid Status Affected Customers Action
📍 Stoke-on-Trent (ST1) THIS INCIDENT 253,149 Active Outage 17 properties Current Page
Birmingham 1,092,246 2 Active Outages 22 accounts Check →
Coventry 351,559 1 Active Outage 0 (100% Operational) Check →
Sandwell 328,854 Grid Stable 0 (100% Operational) Check →
Dudley 311,746 Grid Stable 0 (100% Operational) Check →
Wolverhampton 285,456 1 Active Outage 122 accounts Check →
Walsall 242,974 1 Active Outage 1 accounts Check →
Solihull 205,572 Grid Stable 0 (100% Operational) Check →
Worcester 124,580 Grid Stable 0 (100% Operational) Check →

Severe Weather Impact, Overhead Conductor Dynamics & Environmental Stress

Focus: Overhead Line Galloping & Underground Moisture Ingress
Distribution Transformer Analysis inspecting utility infrastructure in Stoke-on-Trent (ST1)
Active technical deployment deployed for Stoke-on-Trent (ST1): Infrared thermal imaging of distribution busbars and terminal joints. Distribution Transformer Analysis

Atmospheric conditions across West Midlands have subjected local distribution assets in Stoke-on-Trent (ST1) to severe physical mechanical stress. In overhead line networks—widespread across suburban fringes, rural corridors, and feeder links—gale-force wind gusts exceeding 50 mph induce high-amplitude conductor oscillation (conductor galloping). When phase conductors swing into proximity with earthed crossarms or adjacent phases, transient phase-to-phase flashovers trip automated pole-mounted auto-reclosers (PMARs) configured with two or three rapid reclose cycles.

Field surveillance by National Grid ED (West Midlands) line inspection teams targets physical line strikes from airborne storm debris, uprooted third-party vegetation, or fallen tree branches encroaching on statutory clearance easements under The Electricity Safety, Quality and Continuity Regulations (ESQCR) 2002. Furthermore, in coastal and estuarine zones of the UK, airborne salt spray depositing marine saline coatings on ceramic and composite pin insulators creates conductive leakage paths, precipitating tracking faults and pole-top transformer fires upon moisture activation.

In areas where distribution lines run underground, seasonal ground saturation and freeze-thaw cycles exert shear force on legacy paper-insulated lead-covered (PILC) and modern cross-linked polyethylene (XLPE) cable joints. Moisture ingress into micro-fissures generates high-resistance partial discharge activity that ultimately breaches dielectric breakdown thresholds, necessitating specialized fault-finding vehicles equipped with Time Domain Reflectometry (TDR) and acoustic thumpers.

🛡️ Citizen Action & Electrical Safety Protocol

Essential safety procedures and statutory consumer protections for Stoke-on-Trent (ST1).

⚡ Step 1: Fusebox Check

Consumer Unit & RCD Trip Verification

Check whether your main Consumer Unit (fusebox) has tripped. If the Residual Current Device (RCD) or an individual Miniature Circuit Breaker (MCB) is down, toggle it up. If street lighting and neighbouring homes are also unlit, the issue is on National Grid ED (West Midlands)'s external 11kV/LV distribution grid, not your home wiring.

📞 Emergency Dispatch

Call 105 Free National Power Cut Line

Dial 105 free from any UK landline or mobile phone to connect directly to National Grid ED (West Midlands)'s emergency control room. Report hazardous damaged lines, fallen wooden poles, or substation smoke. The line operates 24/7/365 across England, Scotland, and Wales.

🧊 Food Safety

Food Standards Agency (FSA) 4-Hour Rule

Keep refrigerator and freezer doors firmly closed. A standard unopened domestic fridge safely maintains food temperatures for 4 hours. A full unopened freezer will keep contents safe for up to 48 hours (24 hours if half full). Discard perishable dairy and poultry if fridge temperature exceeds 8°C for over 2 hours.

🛡️ Equipment Safety

Appliance Surge Isolation Protocol

Switch off sensitive electronic devices—including OLED televisions, desktop computers, heat pumps, and induction hobs—at the wall socket. When National Grid ED (West Midlands) re-energizes the local circuit, momentary inductive inrush voltage spikes can damage sensitive microprocessors.

💷 Legal Rights

Ofgem £95 Compensation Eligibility

Under Ofgem Guaranteed Standards, if your electricity supply is interrupted for 12 continuous hours under normal weather conditions, you are legally owed £95 by National Grid ED (West Midlands), plus £40 per additional 12-hour block (up to £360). In most cases, DNOs must credit your supplier within 10 working days.

🚨 Vulnerable Households

Priority Services Register (PSR) Support

If anyone in your household is of pensionable age, has a disability, is reliant on vital medical equipment (oxygen concentrators, kidney dialysis), or has an infant under 5, contact National Grid ED (West Midlands) to request emergency backup power, warm facilities, or mobile welfare vans under PSR guidelines.

📶 Communications

Emergency 999 National Roaming & Wi-Fi Calling

If your primary mobile carrier (EE, O2, Vodafone, or Three) loses cellular coverage, emergency 999 calls will automatically national-roam onto whichever carrier mast has operational battery backup in your area. For standard calls, connect your handset to battery-backed Wi-Fi.

🔥 Life Safety

Gas Smell Safety: 0800 111 999

If you smell natural gas during a blackout, do NOT touch any light switches, do NOT light candles, and do NOT use doorbells. Extinguish open flames, open windows to ventilate, evacuate all occupants, and immediately call the National Gas Emergency Service free on 0800 111 999.