Skip to main content
Live Grid Telemetry LIVE TELEMETRY: All 4 UK Nations & 14 DNO Licence Areas Monitored
Sync: 15m
Active 97 properties 📮 DN20
⏱️ Logged: 26 Nov 2026 at 3:19 pm GMT

Northern Powergrid (Yorkshire) — Broughton (DN20) Power Cut

Locally Identified Impact Area: Broughton (Postcode DN20) — NPG INCD-842014-A

📊 Executive Incident Telemetry

DNO Open Data / Telemetry
⏱️ Target Re-Energisation (ETR)
27 Nov 2026 at 8:47 pm GMT
Calculating...
Operator / Service
Northern Powergrid (Yorkshire)
Leeds, Sheffield, Bradford, York, Hull, Wakefield, Doncaster
Impact / Status Scope
97 properties
Licensed Feeder & Postcode Block
Elapsed Outage Time LIVE
26h 37m
Since 15:19 GMT
⚖️ Ofgem £135 Claim Active
Target ETR Window
27 Nov 2026 at 8:47 pm GMT
Subject to Field Verification
Reported Cause / Type
The power cut affecting your property has been caused by an unexpected problem with the cables or equipment that serve your area. If you need to report an emergency, please call 105
Distribution Grid Event
Regulatory Oversight
Ofgem
Ofgem SI 2015/699 (£95 / 12h)

🗳️ 1-Click Community Status Verification

Are you currently affected in Broughton (DN20)? Help neighbours and DNO loggers verify ground truth.

0 Verified Reports
🔴 Off: 0% (0) 🟡 Flickering: 0% (0) 🟢 Restored: 0% (0)

🗺️ Live Incident Epicenter & Regional Surveillance

Centered on Broughton (DN20) — Coordinates: 53.5572, -0.5053
💡 Use two fingers to pan or zoom the map. One finger scrolls the page.

Live Community Reports & Local Street Updates

Share what is happening at your UK postcode to help verify restoration progress for neighbours.

1 Verified Updates
Pat Anderson YO18 • 7 Crossgate Lane, Pickering YO187EX Service Down

Total loss

Share this live UK outage status:

⚙️ Official 5-Stage Network Restoration Progression

✓ 1. Fault Logged
DNO telemetry alarm raised
✓ 2. Network Switching
Remote feeder sectionalising
✓ 3. Crew Dispatched
Field engineers en route
⚡ 4. Physical Repair
Line / substation repair
5. Re-Energised
Full supply restored

🏙️ Regional Grid Matrix: Surrounding Towns & Districts in Yorkshire and the Humber

Comparative telemetry surveillance across neighbouring administrative zones.

8 Local Districts
District / City Est. Population Grid Status Affected Premises Action
📍 Broughton (DN20)
THIS INCIDENT
19,373 Active 97 properties Current
Leeds 763,625 14 Active 91 Check →
Sheffield 543,622 8 Active 160 Check →
Bradford 542,402 10 Active 249 Check →
Kirklees 423,904 10 Active 79 Check →
Wakefield 324,939 12 Active 50 Check →
Doncaster 283,383 5 Active 0 (Stable) Check →
Barnsley 262,828 3 Active 0 (Stable) Check →
Hull 262,016 5 Active 0 (Stable) Check →

🧭 Permanent Utility & Postcode Outage Hubs

Monitor ongoing utility infrastructure health, historical reliability and nearby sector telemetry across Broughton (DN20).

Verification & Oversight Facts — Incident #27230

Power Cut
Telemetry Source Official UK Operator Open Data / Feed
Monitored Provider Northern Powergrid (Yorkshire) (724 incident(s) in past 30 days)
UK Region & District Broughton (DN20) — Yorkshire and the Humber (858 regional power cut event(s) in 30 days)
Statutory Regulator Ofgem — Ofgem SI 2015/699 (£95 / 12h)
Official Helpline / Map 105 • Postcode Hub: DN20

Recent Northern Powergrid Incidents

All Northern Powergrid Logs →
Location / Area Status Impact Logged
Selby (YO8)
Selby (Postcode YO8) — NPG INCD-842411-A
Active 64 properties 27 mins ago
Bradford (BD4)
Bradford (Postcode BD4) — NPG INCD-842403-A
Active 107 properties 40 mins ago
Sheffield (S11)
Sheffield (Postcode S11) — NPG INCD-842397-A
Active 160 properties 1 hours ago
Bradford (BD20)
Bradford (Postcode BD20) — NPG INCD-842357-A
Active 66 properties 2 hours ago
Sowerby (YO7)
Sowerby (Postcode YO7) — NPG INCD-842292-A
Active 3 properties 4 hours ago
Easingwold (YO61)
Easingwold (Postcode YO61) — NPG INCD-842313-A
Active 170 properties 3 hours ago

Other Power Cut Logs in Yorkshire and the Humber

Yorkshire and the Humber Hub →

Incident #27230 Questions & Consumer Guidance

What is the current status of Northern Powergrid (Yorkshire) incident #27230 in Broughton (DN20)?
Incident #27230 (Power Cut) in Broughton (DN20) is logged as Active via Official UK Operator Open Data / Feed (97 properties). Over the past 30 days, 724 incident(s) have been logged for Northern Powergrid (Yorkshire).
When is Northern Powergrid (Yorkshire) expected to restore service in Broughton (DN20)?
Current telemetry targets restoration around 27 Nov 2026 at 8:47 pm GMT, subject to field engineering progress.
Are households in Broughton (DN20) eligible for Ofgem £95 compensation on incident #27230?
Under Ofgem Guaranteed Standards (SI 2015/699), unplanned normal-weather electricity cuts exceeding 12 continuous hours qualify for £95 plus £40 per additional 12-hour period (capped at £360). This incident has currently logged 26h 37m.
Related UK Consumer Guide
UK Power Cuts: How to Call 105, Verify Your DNO & Claim £95 Ofgem Compensation
Read Guide →